Table 5a – Energy consumption of arenas by renovation type, 2014
Renovation type Renovations Floor space affected
# of buildings QI millions of m2 QI Total floor space (%)*
Ice making equipment (refrigeration plant) 431 A 1.30 A 11.1
Heat recovery on refrigeration plant equipment 189 A 0.66 A 5.6
Reflective (low emissivity) 154 A 0.47 A 4.0
Building insulation (including weather stripping) 197 A 0.60 A 5.1
Windows and doors 191 A 0.49 A 4.2
Lighting equipment 617 A 2.19 A 18.6
Lighting energy control management system 241 A 0.81 A 6.9
Space heating 307 A 0.89 A 7.6
Space cooling 168 A 0.52 A 4.4
Heating and cooling energy management system 169 A 0.76 A 6.5
Other 65 A 0.15 A 1.3

Footnotes:

*Facilities may have implemented more than one renovation/retrofit and, as such, may appear multiple times in this table. 'Total floor space' represents % of all Canadian arena floor space.


Notes:
(1) Due to rounding, numbers may not add up to the total shown, and some numbers may differ from one table to the next.
(2) Quality indicators (QI) classify each estimate according to its quality as follows: A–Excellent, B–Good, C–Acceptable,
F–Unreliable, and X–suppressed due to confidentiality.
(3) Table includes all renovations having occurred between January 2010 and March 2014.

Source : Survey of Energy Consumption of Arenas 2014.