Natural Resources Canada
Symbol of the Government of Canada

Office of Energy Efficiency Links

 

Communities and Government

E-85 Federal Bulk Fuelling Facilities

Correctional Services Canada, Agriculture and Agri-Food Canada, and Natural Resources Canada operate 13 on-site E-85 refuelling sites:

Corrections Site – Stony Mountain Institution

Highway 7
Winnipeg MB

Corrections Site – Drumheller Institution

Highway 9
Drumheller AB

Corrections Site – Maximum Security Institution

21611 Meridian Street
Edmonton AB

Corrections Site – Grande Cache Institution

Bag 4000, Hoppe Avenue
Grande Cache AB

Corrections Site – Bowden Institution

Highway 2
Innisfail AB

Corrections Site – Saskatchewan Penitentiary

15th Street West
Prince Albert SK

Agriculture Canada Site – Lethbridge Centre

5403 - 1 Avenue South
Lethbridge AB

Agriculture Canada Site – Agassiz Research Centre

6947 Highway 7
Agassiz BC

Experimental Farm Site – ECORC

960 Carling Ave., Bldg. 114
Ottawa ON

Agriculture Canada Site – Horticulture Research Centre

430 Boul. Gouin
Saint-Jean-Sur-Richelieu QC

Natural Resources Canada Site

580 Booth St.
Ottawa ON

Agriculture Canada Site – Semiarid Prairie Centre

Swift Current SK

Agriculture Canada Site

18th St. and Grand Valley Rd.
R.R. #3
Brandon MB

Federal E-85 bulk facilities are planned in the near future for the following:

  • Indian Head SK
  • Lennoxville PQ
  • London ON
  • Kingston ON
  • Joyceville ON
  • Collenburg ON
  • Millhaven ON